Monday, September 7, 2009

REACTIVE LOADS


When determining the proper generator for REACTIVE type loads, you must consider three modes of operation:
STARTING - The electric motor requires more power to start. The starting power required can be THREE times the running amount.

RUNNING - The power required to run the electric motor after it has been started.

LOADED - When the electric motor begins to work (saw begins cutting wood), its power requirement will increase. This is not applicable for most household appliances.

Reactive Loads



Starting
Running
Loaded

No comments:

Post a Comment